Curriculum vitae Salma TRABELSI

PERSONAL INFORMATION Salma TRABELSI
Route de Gremda, Km 4, Sidi Abbes, BP134, 3062, Sfax, Tunisia
ece.tunisia@gmail.com
Skype : salma2805
Sex Female | Nationality Tunisian

WORK EXPERIENCE
May 2016 – Date
May 2015 – April 2016
Manager of consulting firm / IRCA Lead Auditor ISO14001-2015
Enviro Consulting Engineers
 Environmental, Social and Health Impact Assessment (ESHIA)
 Hazardous Assessment Studies
 Abatement Pollution Studies
 Decommissioning Studies
 Regulatory Monitoring
 Environmental Analysis
 Environmental Audits
 Environmental Management Plans
 Environmental Management Trainings
 Implementation of QHSE Management Systems
Business or sector : Studies & Consulting
Environmental Management Representative
TAV Tunisie – Enfidha-Hammamet / Monastir Habib Bourguiba International Airports – Tunisia

 Implementation of the Environmental Management System of Enfidha-Hammamet International
Airport in compliance with ISO 14001-2015 Standard
 Monitoring of the Environment state in Monastir Habib Bourguiba International Airport
Business or sector : Airports

May 2014 – April 2015 Environmental Consultant
Consulting Firms – Freelance
 Environmental, Social and Health Impact Assessment (ESHIA)
 Environmental & Social Impact Assessment for fracking activities (petroleum exploration and
production activities)
 Waste Management Plans
 Pollution Control Studies
 Urban & Agriculture Hydraulic
 Post Evaluation for water supply projects
 Hydrologic, drainage and sanitation studies
Business or sector : Studies & Consulting

February 2007 – March 2014 Project Manager / Assistant of the Integrated Management Representative
Environmental Assessment & Management (EAM)
 Environmental, Social and Health Impact Assessment for industrial and Oil & Gas companies :

  • Project management
  • Performance of EIA and ESHIA for petroleum, energy and industrial projects
  • Development of bespoke environmental baseline
     Integrated Management System :
  • Implementation and development of QHSE management system in compliance
    with ISO 9001, ISO 14001, and OHSAS 18001 Standards
  • Organization of HSE awareness
  • Monitoring all current regulatory texts related to the company assigned field and
    coordination of all texts’ renewal on a timely basis
  • Investigation and reporting on Client Satisfaction, Incidents, and Key performance
    indicators (KPI)
     Pollution Control Studies for petroleum and industrial sites
     Environmental site assessment and risk analysis: Design and monitoring of petroleum
    decontamination systems
     Preparation of decommissioning studies for petroleum and industrial projects
    Business or sector : Studies & Consulting
    September 2004 – September
    2006
    Technologist Assistant in Geography & Environment
    Institut Supérieur des Etudes Technologiques de Nabeul
    Leading practical and magistral courses in the followings subjects :
     Topography
     Geography
     Environment
     Health & Security
    Business or sector : Education
    September 2001 – February 2003 Geoscientist
    Pierre & Marie Curie University – Hydrology & Environment Sciences Laboratory- France
     Chemical analysis using the Atomic Absorption Spectrometer
     Monitoring of atmospheric pollution using bio-indicators
    Business or sector : Research & Developpment
    February 2001 – July 2001 Geoscientist
    French National Center for Scientific Research – CNRS (Climate & Environment Sciences Laboratory)
    – France
     Chemical analysis using the Atomic Emission Spectrometer in an Inductive Coupling Plasma (ICPAES)
     Paleo-environment reconstruction, biostratigraphy, conventional core analysis, petrophysic and
    sedimentology
     Sea temperature reconstruction in the Mediterranean Sea during the Last Climatic Cycle
    using Mg/Ca ratios of planktonic foraminifera
     Climate Change
    Business or sector : Research & Developpment

    ÉDUCATION AND TRAINING
    PERSONAL SKILLS
    January 2016
    July 2001
    June 2000
    IRCA Lead Auditor ISO14001-2015
    TUV Maghreb
  • Master’s Degree in Geosciences – Major : Geochemistry & Sedimentology
    Paris XI University – France
  • Bachelor Engineering – Major : Geo-Resources & Environment
    Ecole Nationale d’Ingénieurs de Sfax (ENIS) – Tunisia
  • Mother tongue (s) Arabic
    Other language (s) UNDERSTANDING SPEAKING WRITING
    Listening Reading Spoken interaction Listening Reading
    French C2 C2 C2 C2 C2
    English C1 C1 B2 B2 B2
  • Certifications in advanced English / Business English – America-Mideast Educational & Training Services Inc.
    (AMIDEAST)
    Certifications in Business English – Tunisian American Chamber of Commerce (TACC)
    Levels: A1/A2: Basic user – B1/B2: Independent user – C1/C2: Proficient user
    Common European Framework of Reference for Languages
    Communication Skills  Excellent communication skills : I am experienced at working in multinational environment and
    dealing with all the whole company’s personal as an environmental management representative
     Excellent contact with my subordinates : I occuped the position of projects manager for 5 years
     Good telephone manners
    Organisational / Managerial Skills  Leadership acquired through my experience as an Environmental Management Representative in
    an airport (piloting all departments in order to implement the Environmental Management System)
     Excellent organizational and prioritisation skills acquired as the Assistant to the Integrated
    Management Representative, particularly in terms of Quality
     Ability to coordinate teams, manage and monitor projects : these skills was acquired through my
    experience as a projects manager
     Rigour and methodical skills acquired in field work
     Teamwork skills acquired during my professional experience

Job-related skills  Good command of environmental control processes as an IRCA Lead auditor for Environmental
Management Systems
 Ability to work as a member of a multidisciplinary and multinational team
 Tutoring:

  • Supervise students as part of final projects as a teacher at ISET
  • Responsible for the training of new staff recruited in the company as a projects manager
  • ADDITIONAL INFORMATION
    Volunteering Memberships
    Interests
     Reading
     Painting
     Music
    Computer Skills SELF ASSESSMENT
    Information
    Processing Communication Content
    Creation Security Problem
    Solving
    Independent User Proficient User Independent User Independent User Basic User
    Levels: Basic user – Independent user – Proficient user
    Digital competences – Self-assessment grid
    Other Computer Skills :
    ▪ Modeling Applications : MATLAB, AERMOD & CALPUFF, ALOHA, MOPLA3 & PETRA3
    ▪ Microsoft Applications : Windows applications, Word, Excel, PowerPoint, AutoCad, Micrografx
    Designer
    Other Skills DIY
    Driving Licence B
    Presentations
    Professional Affiliations
    References
    Courses
    Certifications
     « Humid periods in the Mediterranean sea during the last climatic cycle » – CNRS Paris – October
    2000
     « Calibration of isotopic fractionation and Mg / Ca content in foraminifera as a function of growth’s
    temperature » – CNRS Paris – July 2001
     Member of NGO « Amis du Belvédère »
     Member of NGO « Protection de la Nature et de l’Environnement Sfax (APNES) »
     Member of NGO « Association Tunisienne du Pétrole et du Gaz »
     Artac UNLU, Operations Director in Enfidha-Hammamet International Airport, TAV Tunisie, E-mail :
    artac.unlu@tav.aero
     Chiheb MAGHREBI, Environmental Manager, Celamin Holdings NL, Phone : 98222973, E-mail:
    cmaghrebi@yahoo.fr
     Jomaa FRIHA, Exploration Advisor, OMV Tunisia Exploration GmbH., Phone : 23408935, E-mail:
    jomaa.friha@omv.com
     Geography & Environment
     Topography
     Health & Security
     HSQE Internal Auditor
     IRCA Lead Auditor ISO14001-2015
     Member of NGO « Un Sourire Pour Tous »
     Member of NGO « Ichrak »
    Curriculum vitae Salma TRABELSI
    © Union européenne | europass.cedefop.europa.eu Page 5 / 6
    ANNEXE : Key projects performed during 2007 – 2019
     Implementation of the ISO14001-2015 and ISO 45001Management System in SNCM, 2019
     ESIA for the modern slaughterhouse of Remada, ODS, 2019
     EIA for Collection, transport and valorisation of used catalysts and electrical and electronic equipment wastes, – Recat Tunisie, 2019
     EIA for storage and exportation of aluminium wastes – Bou Molka, 2019
     EIA for Collection, transport and valorisation of used catalysts and electrical and electronic equipment wastes – ST2R, 2019
     EIA for a Fishmeal Plant configuration, 2018
     EIA for a thermal Spa reconfiguration, 2018
     EIA for Management of Construction and Demolition Wastes, 2017
     Implementation of the Environmental Management System in Nouha Eco Print (Printing Company), 2017
     Implementation of the Environmental Management System in Enfidha-Hammamet International Airport, TAV Tunisie, 2016
     Decentralized post evaluation for water supply project in Gorgol and Guidimakha areas (Mauritania), French Development Agency, 2014
     Ecotourism project in irrigated field Ain Sniene (Jendouba), CRDA Jendouba/World Bank, 2014
     Design of water supply project of 3 rural areas in Jendouba, CRDA Jendouba/World Bank, 2014
     Study for irrigation perimeters supplied by El Melah and Khouitra collinear dams, CRDA Jendouba/World Bank, 2014
     EIA for hydraulic fracking activities on conventional reservoirs of Tarfa-3 well, Baguel Concession, Perenco Tunisia Company Ltd., 2014
     EIA for hydraulic fracking activities on conventional reservoirs of EC-4 and ECS-1DP Wells, Ech Chouech Concession, Winstar, 2014
     Assessment of cumulative impacts of development activities on Baguel 1, 4 and 5 wells, Perenco Tunisia Company Ltd., 2014
     EIA for A-05, A-06, A-15 and A-17 Wells Simulation, Miskar Concession, BG Tunisia, 2014
     EIA for Nawara Concession Development Project – Gas export pipeline construction Project (PK0-PK52), OMV, 2013
     EIA for Nawara Concession Development Project – Central Processing Facilities, OMV, 2013
     EIA for Nawara Concession Development Project – Condensate export pipeline construction Project, OMV, 2013
     EIA for Non Hazardous Waste Incineration Facility in Cherouq Concession, OMV, 2013
     ESHIA for 2D Seismic Program, Ras Korane, Ras Rihane and Nadhour Permits, Repsol, 2013
     Preliminary Environmental Impact Assessment for South Tunisia Oil Development (STOD) Project, OMV, 2013
     EIA for produced Water Disposal in Waha SE-1 Injection Well, Cherouq Concession, OMV, 2013
     Regulatory Monitoring Of SOMOCER Company, 2012
     EIA for the Extended Well Test (EWT) of Amani-1 Exploration Well, Cherouq Concession, OMV, 2012
     EIA for Borj El Khadra South Exploration Program, Borj El Khadra South Permit, Anadarko, 2012
     EIA for A-01, A-07 and A-14 Wells Fracking, Miskar Concession, 2012
     EIA for Workover on Mejda-1 Well, Adam Concession, eni Tunisia b.v., 2012
     EIA for Salloum-3 Expoloration Well, Sfax Offshore Permit, APEX, 2012
     Pollution control study of Douleb CPF, SEREPT, 2012
     EIA for the treatment of Douleb field drilling residues, SEREPT, 2012
     EIA for amino acids plant in Aguila-Gafsa, Biophyres, 2012
     EIA for the pilot plant of developement of process, chemical products and fertilisers, CFIa, 2012
     EIA for Produced Water Disposal in Hammouda Sud Est-1 Injection Well, eni tunisia b.v., 2011
     EIA for offshore oil expedition and loading from Tazerka CPF, eni tunisia b.v., 2011
     ESHIA for seismic survey within Raf Raf and Azmour Permits, Shell Tunisia Offshore GmbH., 2011
     EIA for BBJ-1 Well Site Abandonment, North Kairouan Permit, KUFPEC, 2011
     EIA for 3D seismic survey within Jenein Sud Permit, OMV, 2011
     ESIA for Sidi Mansour Permit (Cercina, Karous-1 and El Attaya drilling areas), OMV, 2011
     ESIA for the seismic survey within the Far West Permit, Petro-Canada Companies of Libya, 2011
     EIA for ecotourism project in Sidi El Barrak dam, Société de Gestion et d’Animation Touristique de Tunisie, 2011
     EIA for the extension project of Galpharma pharmaceutical laboratories, Galpharma, 2011
     EIA for clean-up activities in marine and port areas in Tunisia, Briggs Tunisia, 2011
     Regulatory Monitoring of Shell Company, 2011
     EIA for workover activities in EBB-3 RE2 well, El Bibane Concession, Ecumed, 2010
     EIA for PDG-4 development well, Djebel Grouz Concession, eni tunisia b.v., 2010
     EIA for the 3D Seismic Survey, Nord Anaguid Permit, GBP, 2010
     EIA for 2D seismic survey, Makthar Permit, PA Resources Tunisia, 2010
     EIA for Bir Ben Jenale-1 Exploration Well, North Kairouan Permit, KUFPEC, 2010
     EIA for Ritma-1, Khouloud-1 & Benefsej-1 Exploration Wells, Nawara Concession, OMV, 2010
     EIA for Durra Concession Development Project, Durra Concession, Pioneer, 2010
     EIA for Waha Permanent Production Facility, Cherouq Concession, Pioneer, 2010
     EIA for 3D seismic survey, El Borma Concession, SITEP, 2010
     EIA for use of coal as a fuel in the cement plant of Gabes, Société des Ciments de Gabès, 2010
     Depollution study for the paint plant « Compagnie Africaine des Peintures », 2010
     Depollution study for the cement plnat of Jbel Oust, Les ciments de Jebel Oust, 2010
     EIA for dredging activities in the bay of Sebra, OMMP, 2010
     EIA for Hasdrubal A5 Development Well, Hasdrubal Concession, BG Tunisia, 2009
     EIA for Miskar A18 & Miskar A19 Production Wells, Miskar Concession, BG Tunisia, 2009
     EIA for LPG pipe linking BUTAGAZ and TOTAL Storage areas (Petroleum area of Radès), Butagaz, 2009
     EIA for 2D Seismic Program, Bargou Permit, Cooper Energy, 2009
     EIA for the development of Hammouda CPF, eni tunisia b.v., 2009
     EIA for the development of Oued Zar CPF, eni tunisia b.v., 2009
     EIA for the development of Djebel Grouz CPF, eni tunisia b.v., 2009
     EIA for Baraka pipeline, eni tunisia b.v, 2010
     Pre-EIA for South Tunisia Gas Pipeline Construction Project, Gas Treatment Plant – eni Tunisia b.v., 2009
     EIA for 3D seismic survey, Borj El Khadra Permit, 2009
     EIA for Maamoura 2 & Maamoura E2 wells testing, eni tunisia b.v., 2009
     EIA for MBA#2 exploration Well, Nord des Chotts Permit, ETAP, 2009
     EIA for Didon#10H Development Well, Didon Concession, PA Resources Tunisia, 2009
     EIA for 2D Seismic Survey, Kairouan Nord Permit, Kufpec, 2009
     EIA for 2D Seismic Survey, Ksar Hadada Permit, Petroceltic, 2009
     EIA for Hillal-1 Well Completion, Cherouq Concession, Pioneer, 2009
     EIA for El-Waha Water Well, Cherouq Concession, Pioneer, 2009
     EIA for Produced Water Disposal in Hillal-1 Injection Well, Cherouq Concession, Pioneer, 2009
     EIA for Angham-1 Drilling Residues Treatment, Cherouq Concession, Pioneer, 2009
     EIA for the 3D Seismic Survey, Kondar Permit, TIMGAD, 2009
     EIA for transport of wash-waters of oil storage tanks, SESCO, 2009
     Depollution study for SICOAC plant, SICOAC, 2009
     EIA for Miskar A17 Production Well, Miskar Concession, BG Tunisia, 2009
     EIA for clean-up activities in Tunis golf ports, Espace Nautiques Services, 2009
     EIA for the parcelling project of south public port domain of Zarzis, OMMP, 2009
     EIA for the use of alternative fuels in the cement plant of Gabès, Société des Ciments de Gabès, 2009
     EIA for 3D seismic acquisition dada within West Amal Area, Concession 12, Harouge Oil Operations (Libya), 2008
     EIA for 3D seismic acquisition dada within Gazala Area, Concession 13, Harouge Oil Operations (Libya), 2008
     EIA for 3D seismic acquisition dada within Dorr Marada Area, Concession 13, Harouge Oil Operations (Libya), 2008
     EIA for CPF Eni, eni tunisia b.v, 2008
     EIA for Oudna Field Abandonment, Lundin Netherlands B.V., 2008
     EIA for ASH41B & ASH46B Side Track, Ashtart Concession, SEREPT, 2008
     EIA for ASH42BST, ASH49ST & ASH50ST Development Wells, Ashtart Concession, SEREPT, 2008
     EIA for the 2008 Seismic Survey (2D & 3D), Douleb & Semmama Concessions, SEREPT, 2008